I have been reading a blog for a long time now that does a home to-do list about every six months. I loved the idea of having a list and seeing exactly were you are with the house.
And because we have officially been in our house for ONE year, I thought it would be fun to start doing a list. Things on the list may change over time but for now its our list of things to do. Just as a side note about the house, all of our decisions about remodeling/DIY with the house are based off what will increase the value of the home. But what is the better idea for the future of renting out the house. That's right, we have talked about it and we do not plan on ever selling the house but renting it out... SO all of our decisions are based on spending the least amount of money to remodel/DIY the home to get the maximum amount of rent. With that in mind lets start on the list:
- The Front/SideYard (30% Complete) -
·
Trim Trees
·
Remove the pine tree that
is decaying
·
Aerate, re-seed and
power rake the yard
·
Make flower beds look
wonderful by adding mulch and more plants
·
Repair old cracked
concrete stairs gaps and fixing the chipped concrete
·
Plant a new tree were
pine tree was
·
Re-paint light pole and
re-brick surrounding pole
·
Redo Mailbox
- The Porch (0% Complete) -
To Do:
·
Repaint the porch rails
·
Paint the front door
·
Add new house numbers
·
Add a planter box
- The Garage (25% Complete) -
To Do:
·
Add weather stripping to
garage door
·
Repaint door into garage
and caulk around
·
Add gutter to north side
of garage
- The Back Yard (43% Complete) -
·
Build patio
·
Paint door and trim
·
Build garden boxes and
sandbox
·
Add plants next to house
·
Build an overhang over
the back door
·
Redo the cracked porch
·
Redo gutters along house (After adding overhang)
·
Build a new shed on
north side of garage
·
Possibly build a pergola
·
Build/add outdoor
furniture
- The Living Room (30% Complete) -
To Do:
·
Paint the walls, ceiling
and trim
·
Update vents and light
covers
·
Add new windows and
frame in the windows
·
Update door knobs and
hinges
·
Paint and add shelving
to closet
·
Fix computer desk by
making shelves look built -in
·
Build a media console
·
Make a slipcover for the
couch
·
Add crown molding (Phase
2)
·
Re-stain doors (Phase 2)
- The Kitchen (10% Complete) -
·
Build cabinet above
stove and add microwave (will give us more counter space)
· Add new windows and frame
in the windows
·
DIY kitchen table and
chairs
·
Paint the walls, ceiling
and trim
·
Update the old kitchen
lights
·
Remove door to the stairs
and fix trim
·
Add dishwasher
·
Paint the cabinets
·
Add new hardware
·
Replace old blinds with
new ones
·
Replace sink and plumbing
·
Add new faucet
·
New counter tops and
floors (Phase 2)
·
New fringe and stove
- The Bathroom (58% Complete) -
To Do:
·
Repaint trim
·
Update door knob &
hinges
·
Paint old mirror but one
day add new mirror (Phase 2)
·
Upgrade lighting above
sink and ceiling
·
Add new ceiling fan
·
Re-grout tile and one
day replace (Phase 2: Tiles are cracked
and move when you walk on them.)
·
Replace toilet (Phase 2)
·
Add hooks and remove towel bar
-Upstairs Hallway (93% Complete) -
To Do:
·
Paint walls and ceiling
·
Repaint all of the trim
and cabinet doors
·
Remove paint from hinges
and add new hardware
·
Update light
·
Add artwork
- The Master Bedroom (28% Complete) -
To Do:
·
Paint walls, ceiling and
trim
·
Repaint closet and one
day, new shelving
· Add new windows and
frame in the windows
·
Add blinds to windows
·
Add headboard to bed
·
Make a new quilt for bed
·
Add artwork, mirror, and
maybe curtains
·
Update door knobs and door hardware
·
Re-stain doors (Phase 2)
·
Add crown molding (Phase
2)
- Kid’s Room (30% Complete) -
To Do:
·
Paint walls, ceiling and
trim
·
Add new windows and
frame in the windows
·
Add blinds and maybe
some curtains
·
Paint closet
·
Re-stain doors
·
Update door knobs and
hardware
·
Add crown molding
·
Add artwork/picture
frames
- The Stairs (21% Complete) -
·
Paint the walls and
ceiling
·
Paint trim and access
door
·
Paint backdoor
·
Add coat hooks
·
New light fixture
·
Redo wall (previous
owners added but needs to be fixed)
·
Build shelving above
stairs ???
- Basement Play/Living Room (0% Complete) -
To Do:
·
Make one window to code
and add new windows
·
Insulate room
·
Redo electrical and
plumbing
·
Create a closet under
stairs
·
Install carpeting/flooring
·
Remove wall paneling
·
Install drywall
·
Add trim and crown
molding
·
Paint walls, ceiling,
and trim
·
Paint door and update
hardware
·
Add wood blinds or
curtains
·
Add a ceiling light
fixture
- Basement Bedroom (0% Complete) -
To Do: Complete remodel
·
Make window to code and
add new window
·
Insulate room
·
Redo electrical
·
Add a closet
·
Remove old carpeting and
install new
·
Remove wall paneling and
ceiling paneling
·
Install drywall
·
Add trim and crown
molding
·
Paint walls, ceiling,
and trim
·
Paint door and update
hardware
·
Add wood blinds or
curtains
·
Add a ceiling light
fixture
- The Basement Craft Room (7% Complete) -
To Do: Complete remodel
·
Make window to code and
add new window
·
Insulate room
·
Redo electrical and
plumbing
·
Add door to closet and
add vent in closet
·
Remove brick box behind door
·
Remove old carpeting and
install new
·
Remove wall paneling and
ceiling paneling
·
Install drywall
·
Add trim and crown
molding
·
Paint walls, ceiling,
and trim
·
Paint door and update
hardware
·
Add wood blinds or
curtains
·
Add a ceiling light
fixture
·
Add new window
·
Redo electrical and
plumbing
· New water heater and move water heater to
storage/laundry room
·
Remove and replace
shower
·
Remove old flooring and
install new
·
Remove and replace
toilet
·
Remove and replace
vanity
·
Remove wall paneling and
ceiling paneling
·
Install drywall
·
Add trim
·
Paint walls, ceiling,
and trim
·
Paint door and update
hardware
·
Add a ceiling and vanity
light fixture
- The Laundry/Storage Room (0% Complete) -
To Do:
·
Add floor drain
·
Redo electrical and add
plumbing
·
Move water heater to
space
·
Maybe add a sink (if enough room)
·
Move washer/dryer into
the room
·
Put cabinets above
washer and dryer
·
Insulate room and add
drywall ???
·
Add storage shelving
- General Whole House Ideas (12% Complete) -
To Do:
·
Replace all windows (only the basement windows are left)
·
Redo all electrical and
plumbing
·
Replace all light switch
plates and outlets in the house
·
Replace roof